REQUESTING SUB-BIDS FROM QUALIFIED MBE/WBE/OBE SUBCONTRACTORS / VENDORS FOR:

 

Project Name:              The Haynes Units 5&6 Repowering Project

Project Owner:             Los Angeles Department of Water & Power

Bid Deadline:                August 2, 2010 (date due to ARB)

 

SUBCONTRACTING / VENDOR OPPORTUNITIES INCLUDE:


  • Concrete Testing
  • Controls
  • Demolition
  • Dewatering
  • Earthwork
  • Electrical
  • Fencing
  • Field Erected Tanks
  • Fire Protection
  • Geotechnical Investigation
  • Heavy Haul
  • HVAC
  • Instrumentation
  • Insulation & Lagging
  • Landscaping
  • Painting
  • Paving
  • Piling
  • Pipe X-Ray
  • Post Weld Heat Treatment
  • Pre-Engineered Metal Buildings
  • Scaffolding
  • Soil Mixing
  • Soils Compaction Testing
  • Survey
  • Trucking

 

PLANS AND SPECIFICATIONS INFORMATION:

ARB FTP Site:             http://arbftp.com/ (User: arbind Password: industrial)

LADWP:                      http://www.labavn.org/

For Purchase:               C2 Reprographics (949) 768-8066

Viewing at ARB:           By appointment

 

HAYNES POWER PARTNERS

A Joint Venture between ARB and Burns & McDonnell

(An Equal Opportunity Employer)

For information on availability of plans and specifications and the bidder’s policy concerning assistance to subcontractors in obtaining bonds, lines of credit, and/or insurance, please contact our office at:

ARB, Inc.                                                                                                        Phone: (949) 598-9242

26000 Commercentre Drive                                                                              E-Fax (949) 271-5540

Lake Forest, CA 92630                                                                                       Fax: (949) 595-5525

Phil Reed, preed@arbinc.com                                             Dawn Isernhagen, disernhagen@arbinc.com